/pilot composting facility/ Palestine 2012
The facility, located in the area of Beit Lahia WWTP (Waste Water Treatment Plant), is a composting facility which process agricultural waste and mixed with organic fraction of MSW. The raw material collection system has been developed using donkey carts. Supplied with a special box.
The facility equipment had been entirely constructed inside Gaza strip.
Project client CRIC Centro Internazionale di Intervento per la Cooperazione NGO.
The hangar of the plant has been designed as a green roof hang on a recycled greenhouse metal structure.
The composting process include a refining phase to be done with a trommel screen portable